Project Description

Location:
Pearisburg, VA
Owner: U.S. Cellular

BTM Engineering, Inc. Telecom team assisted the tower construction company to verify ‘Post-Modification Inspections’. Tower diagonals were inspected at the 100′-110′ bay and approved as part of the structural analysis. Experienced in: KY, IN, TN, VA, W.VA, AL, MS, NC, OK, OH,IL, FL.